xinjiang hotan airport
in 2015, boda construction group won the bidding for the interior decoration and construction of the xinjiang hotan airport terminal, and the project is an important construction for xinjiang province.
the construction includes entire interior design and decoration, waterproof work, getting the drainage pipe up, installing facilities etc. faced with tense schedule, boda’s iron troops pulled through much challenges, and finished in january of 2016, in time for the use of the terminal, which was greatly praised by the client.
after hotan airport was expanded, it satisfied the growing need for civil aviation transport, and also helped develop the hotan district’s economy and society.